2016. Zitlaltepec, Tlaxcala.
Two substations for a total of 13,000 KVA.
Four 250HP compressors each.
Hot water generation for 1,300,000 KCAL/HR.
SCI 2 diesel pumps of 2500GPM and tank 280K Gal.
Plumbing including LP gas for production.
Washed air, ventilation and HVAC for Offices.
Electroducts for molding machines.
Medium voltage system with redundancy.
TECHNICAL ROOMS.
Separate area to the building where the medium voltage substation, compressor area, hot water system and chilled water system are located.
CONSTRUCTION VALUE $180 M MXN
PROJECT AREA 54,560 m²
Project Information
Details
Ubication:
Zitlaltepec, Tlaxcala.
Completed:
2016
Cost:
$180M MXN
Dimensions:
54,560 m²
Services:
Production