In construction. Tepic, Nayarit.
1 Substation with two 2000 kVA transformers.
1 500KW generators.
Fire fighting system (sprinklers, hoses & extinguishers).
1 fire water tank of 200,000 gallons.
2 Diesel Pumps of 2,500Gal/min.
5 Air Compressors of 50HP CFM 125 PCIG Capacity 236ACFM of 50 HP.
2 Hydropneumatics for drinking water with 7.5 HP variable speed pumps.
For the Dräxlmaier project in the city of Tepic, Nayarit, all the main rooms of the systems that make up the project are concentrated.
Among them is the compressed air compressor room, Substation and electrical room, compressor room, well room.
CONSTRUCTION VALUE $144 M MXN
PROJECT AREA 12,761 m²
Project Information
Details
Ubication:
Tepic, Nayarit
Completed:
2018
Cost:
$144M MXN
Dimensions:
12,761 m²
Services:
Automotive